Home Page
-

Projects & Research

  Collection of Soil Samples

Initially two DOE sites will be used for study, the Oak Ridge NABIR Field Research Center and the Pit 7 Complex at Site 300 of LLNL. Both sites are well characterized and have uranium as a principal contaminant of concern. The Oak Ridge site has high concentrations of uranium, low pH, and high nitrate. The LLNL site has much lower concentrations of uranium, neutral pH, and low nitrate. Samples can be obtained from Oak Ridge via the NABIR Field Research Center and from the LLNL site restoration manager. The three Core Groups also have access to several Office of Environmental Management funded projects at metal and radionuclide contaminated sites at Savannah River, Hanford, and INEEL, which could be sources for samples for later studies.

 
       
Copyright © VIMSS All rights reserved | Contact | Terms of Use | Privacy